You are breaking the implementation plan into concrete, dependency-ordered tasks that can be executed one at a time.
Steps
1. Read artifacts
Read:
spec/plan.md(must exist — if not, direct user to/formspec.plan.4)spec/formal/traceability.md- All feature design docs: Glob for
spec/features/*/design.md
2. Generate spec/tasks.md
Write spec/tasks.md with two sections: implementation tasks and verification milestones.
Implementation tasks are fine-grained and component-oriented — they track what code to write. Verification milestones are coarser and property-oriented — they define when a TLA+ property can actually be validated end-to-end. This separation exists because the implementation architecture is more fine-grained than the specification: a single formal property (e.g., crash safety) typically spans multiple implementation components (persistence layer + coordinator + integration tests), so no single task is a meaningful checkpoint for validating it.
Task format
# Implementation Tasks
## Task T-01: [Title]
**Depends on**: (none | T-XX, T-YY)
**Implements**: US-3, SC-1 (from 2026-02-10-user-auth)
**Description**: [What to implement — specific enough that the implementer knows exactly what code to write]
**Acceptance**: [Unit-level criteria — how to verify this component works in isolation. Must be objectively verifiable. These are TDD checkpoints, not TLA+ property verification.]
Tasks do NOT have a "Verifies" field for TLA+ properties. Individual tasks verify their own component contracts through unit tests; TLA+ properties are verified at the milestone level.
Milestone format
After the tasks, add a milestones section:
# Verification Milestones
## Milestone M-01: [TLA+ Property or property group]
**Tasks**: T-02, T-04, T-05, T-08
**Verifies**: PersistBeforeGrant, EventualRecovery (from System.tla)
**Verification method**: `go test -race -run Recovery ./coordinator/...`
**Description**: [What this milestone validates and why it requires all the listed tasks to be complete first]
A milestone gates on a set of tasks. Only after all of its tasks are complete can the verification method be run and the result recorded in the verification matrix. A single task may appear in multiple milestones. A single milestone may verify multiple related properties.
3. Coverage requirements
Tasks must collectively cover:
- All user stories from all feature design docs (every US-N must appear in at least one task's "Implements" field)
- All implementation components from the plan's architecture
- F proof modules* if included in the plan
- Infrastructure setup tasks (project scaffolding, CI configuration, test harness) where needed
Milestones must collectively cover:
- Every TLA+ property from traceability.md that has a runtime or integration-level verification method
- Every verification method from the plan's Verification Strategy table
- Properties verified by structural or compile-time guarantees do not need milestones — they are validated by the data model or type system, not by test execution
4. Dependency ordering rules
- Foundational types, interfaces, and data models before business logic
- Verification infrastructure (test harness, F* module structure) before verification tasks
- Core functionality before features that depend on it
- No circular dependencies
- Tasks should be small enough to implement in a single session but large enough to be meaningful (not "create a file" granularity)
- Each task should be independently testable with unit tests after its dependencies are met — if a task can only be tested as part of a larger integration, it should be merged with the tasks it depends on or the milestone structure should be reconsidered
5. Validation
Before finishing, check:
- Every US-N from every feature design doc is covered by at least one task
- Every TLA+ property from traceability.md with a runtime verification method is covered by at least one milestone
- Every milestone's task list references valid task IDs
- Every task's dependencies reference valid task IDs
- No circular dependency chains exist in the task graph
- The dependency graph has a valid topological ordering
- Every milestone's tasks collectively provide the components needed to execute its verification method (e.g., a milestone that verifies crash recovery must include tasks for persistence, the coordinator, and the recovery integration test)
Report any gaps found during validation. Suggest proceeding with /formspec.implement.6 to start implementing tasks.